Never Met A Machine I couldn’t Fit

Machine control systems from Aptella

“If it’s got a cutting edge and it moves dirt, we can measure it” Gary Roberto Jay Jeff Some of Aptella’ most experienced field technicians and installers look back on unique and challenging jobs they’ve had over the years. With more than 30 years in the industry of fitting machine guidance technology to earthmoving and mining plant, Aptella has forged a reputation for getting even the most challenging and unique machines up and running, often when they’ve never been done or attempted before. Gary Campbell, General Manager for the company’s Integrated Solutions Group, says that although machine manufacturers are now offering integrated machine systems as something relatively ‘new,’ Aptella has had this capability for years. “We’ve been integrating

Save time and money with construction site set out technology

Site set out for concreters technology

What is construction site set out technology? String lines have been an integral part of the construction industry for as long as most foremen, builders, and contractors can remember. Nearly 90% of Australian building sites currently make use of string line technology for setting out. The principal drawback of string lines is the potential for small errors to have frustrating consequences. A small measurement error can potentially prove to be costly and time-consuming. Subcontractors are responsible for setting out accurate measurements on 60% of Australian building sites. Unfortunately, we are currently experiencing a shortage of around 1,500 surveyors nationally. This is making the process of getting a surveyor to set out a site in a timely fashion more

How GPS machine guidance can optimise your landfill operations

gps landfill compactor

Andrew Granger is the business manager for mining, solar and landfill solutions at Aptella. Here, he outlines the key benefits to implementing GPS machine guidance on landfill sites. As the population grows, so too does the demand for waste management facilities. The pressure is on our industry to ensure landfill management is as efficient and productive as possible, maximising every potential to save on space, time, and resources. Accurate and optimised compaction is critical to delivering on these goals. Are you using GPS to manage your compaction? Poor compaction exposes a landfill site to numerous risks, including inefficient airspace use, greater settlement, and shortened cell life, all leading to lost time and money. Relying solely on an operator’s

Construction set out: Australian builders’ new best friend

Construction layout tool - construction total station Topcon LN-150

Introducing construction set out  Have you ever tasked your skilled tradesmen with hours of set out, painstakingly using a string line and tape measures? Or forked out hundreds in labour costs, only to discover your work was out by a few critical millimetres? Suffered extra project time re-doing your work, or trying to organise a surveyor to come to site? You are not alone. An estimated 90% of construction sites Australia-wide are still using string lines and a tape measure for set out. This leads to measurement mistakes, which leads to project delays and an increase in project costs to fix these mistakes. Surely there’s an easier way. That’s why Aptella is offering a hassle-free, easy, construction set

Getting NSW Construction Back On Schedule After Unprecedented Lockdown

Topcon Ln-150 Construction set out tool

July 2021 has seen the NSW government shut down all construction works across the Sydney, Central Coast, Blue Mountains and Wollongong areas. Amongst organising site-security and shut down, head contactors and the sub-contractors that were mobilised onsite are now in planning mode. What will the re-opening of construction sites look like? When will this occur and in what capacity? How will we re-mobilise, get back to the works that were halted, and most importantly how will we be able to get back on-time and on-schedule. One of the considerations will be ‘do we need to create a new schedule for the build or try to catch up on lost time and meet the previous contracted schedule?’ The Topcon

Fyfe implements MiRTK when working in highly vegetated and hilly areas

Mirtk UHF correction services

Lauren Baguley, Surveyor, Fyfe was looking for an alternative to UHF when working in the highly vegetated and hilly regions, particularly in the Pilliga Forest near Narrabri, when she was introduced to MiRTK internet enabled corrections from Aptella by a colleague. Ms Baguley and her team focuses on surveying and aerial mapping within the agricultural, construction and mining industries for the Narrabri area. “We do struggle with UHF when we’re out in the scrubby country around here, it’s quite hilly. Where there’s a lot of vegetation, sometimes we can’t even get a kilometre away from the base so there’s a lot of leap frogging going on and having to set up the base multiple times is painful when

Z+F PROFILER 9020 2D laser scanner available from Aptella

z+f Profiler 9020 Aptella

This highly efficient 2D laser scanner is made for mobile mapping applications and with its scan rate of more than 1 million points/sec. and scanning speed up to 267 profiles/sec., very short distances between profiles can be achieved even at a high speed of a moving platform. The PROFILER 9020 offers significant accuracy and speed improvements over the previous generation 9012, in a form factor that is 50% smaller and lighter,” said Geoffrey Preece, Market Development Manager – Scanning, Aptella. The PROFILER features a new and very powerful laser technology as well as further developed algorithms that ensures highly accurate measurement results on rails, roads, street signs and other traffic control systems, such as traffic lights. “The PROFILER

NSW Building Construction Legislation enforces build to design and record-keeping: Topcon LN-150 the construction set out tool for the job!

Topcon Ln-150 Construction set out tool | Digital layout tool

Building Commissioner David Chandler has announced two new Acts in New South Wales that aim to combat poor build quality in some multi-story housing developments. At the same time Mr Chandler has been granted significantly increased rights and powers when it comes to shutting down work sites, through stop-work-orders for poor builds and as of July 1st 2021, for poor reporting and record keeping. The new Acts mean that all designs must be submitted and approved ‘for construction’ and uploaded into the portal six months before work on site begins. The builder will then need to build to this design and any changes to be re-submitted. The Topcon LN-150 construction set out tool from Aptella makes this process